Thanks to digital progress and efficient processes, getting a new GEPCO connection is now easier than ever. Whether you need electricity for your home, business, or industry, GEPCO provides a direct method to ask for a new connection of the GEPCO online and offline meter.
GEPCO has modernized its processes to increase customer comfort, including introducing digital applications, new meter connections in real-time, and transparent fee structures. By understanding the process and requirements, applicants may avoid delays and ensure a trouble-free experience.
Anyone who requires new electricity in GEPCO jurisdiction, including residential, commercial, and industrial consumers, may apply. This process is designed to ensure a safe and legal approach to electricity.
The new GEPCO connection system is designed to ensure that only competent applicants receive new connections, thereby preventing unauthorized use and electricity theft. This system allows real estate owners, tenants (with the owner's consent), and businesses to apply for new connections if they meet the GEPCO criteria, ensuring a safe and legal approach to electricity.
If you want to ask for an online GEPCO application new connection, you need:
Ensuring all documents are correctly presented will speed up the new GEPCO connection and prevent refusal or delay.
The GEPCO online application for a new connection allows consumers to submit their requests from home. Follow these steps:
This online process reduces physical visits and allows applicants to monitor their applications conveniently.
For those who prefer manual submission, visit the nearest GEPCO office, collect the form, attach the necessary documents, and send it for processing. Office visits allow applicants to personally address questions and get instructions for the technical aspects of the application.
New GEPCO connection fees depend on type and load:
The new GEPCO connection fee includes:
A table of estimated fees
Connection Type | Application Fee | Security Deposit | Meter Cost | Total Estimated Cost |
Residential | PKR 500 | PKR 5,000 | PKR 3,500 | PKR 9,000 |
Commercial | PKR 1,000 | PKR 10,000 | PKR 7,000 | PKR 18,000 |
Industrial | PKR 2,500 | PKR 25,000 | PKR 15,000 | PKR 42,500 |
Technical requirements
Before installation, the GEPCO inspection is carried out to ensure the following:
After sending an application for a GEPCO connection, approval usually takes 15-30 days. However, a greater connection may take longer due to technical assessments.
Once approved:
Consumers can check the application status using the official website's new GEPCO connection system.
If you move to real estate with an existing GEPCO connection, you can transfer ownership by applying together with the documents of assets and CIC.
Do you need more loads? You can apply for upgrades via a new GEPCO connection system and ensure that your premises meet other energy requirements.
The new connection application remains valid for 90 days. If the applicant does not complete the process, he may have to ask again.
All previous fees must be cleaned before the new connection is released.
If your request is rejected, check the reason, fix the problems, and reuse it.
Urgent processing may be available for an additional fee. Contact GEPCO support for more details.
You can change the connection type by sending the request and the necessary documentation.
If the meter is damaged, immediately submit it to GEPCO. A spare fee may be applicable.
Yes, but each connection requires separate documentation and justification for further energy demand.
It's crucial to provide accurate details in your application, as any incorrect information may lead to rejection. Therefore, it's important to double-check your data before submitting your application to avoid any delays or issues.
Yes, unauthorized use before installing the meter is considered electricity theft and can lead to legal measures.
If you need to cancel your new GEPCO application for any reason, you can do so by submitting a written request before the meter is installed. This process ensures that you can easily manage your application if your circumstances change.
In some cases, installment plans may be available. The customer supports GEPCO support for specific details.
Report the problem to GEPCO customer service. The team will check and replace the faulty meter if necessary.
The application for a new GEPCO connection is now more accessible using online systems and transparent procedures. Use the GEPCO website or call the helpline. Following this manual, you can efficiently go through the GEPCO connection and ensure a smooth installation process.
To check your electricity bill online in Pakistan, you can visit the website for your electricity provider and enter your 14-digit reference number. You can find your reference number on any previous bill.
You can check your Sui Gas bill online by visiting the Sui Northern Gas Pipelines Limited (SNGPL) website or the Sui Southern Gas Company (SSGC) website, and entering your 10-digit consumer number.
© 2025 PakBills. All rights reserved.