GEPCO New Connection Application: Fees, Process, & Tracking

Thanks to digital progress and efficient processes, getting a new GEPCO connection is now easier than ever. Whether you need electricity for your home, business, or industry, GEPCO provides a direct method to ask for a new connection of the GEPCO online and offline meter.

GEPCO has modernized its processes to increase customer comfort, including introducing digital applications, new meter connections in real-time, and transparent fee structures. By understanding the process and requirements, applicants may avoid delays and ensure a trouble-free experience.

The eligibility and requirements

Who can apply for a new GEPCO connection?

Anyone who requires new electricity in GEPCO jurisdiction, including residential, commercial, and industrial consumers, may apply. This process is designed to ensure a safe and legal approach to electricity.

The new GEPCO connection system is designed to ensure that only competent applicants receive new connections, thereby preventing unauthorized use and electricity theft. This system allows real estate owners, tenants (with the owner's consent), and businesses to apply for new connections if they meet the GEPCO criteria, ensuring a safe and legal approach to electricity.

Required documents for new GEPCO connection

If you want to ask for an online GEPCO application new connection, you need:

  1. Copy of the applicant (National ID card)
  2. Proof of ownership of the premises
  3. a proven affidavit for the legal use of electricity
  4. Details of demand to load industrial and commercial connections
  5. Night (without a certificate of objection) for rented or rented real estate
  6. Complete address and closest link to electricity

Ensuring all documents are correctly presented will speed up the new GEPCO connection and prevent refusal or delay.

Step by step, GEPCO's new connection procedure

How to request a new GEPCO online connection

The GEPCO online application for a new connection allows consumers to submit their requests from home. Follow these steps:

  1. Visit the official GEPCO website.
  2. Go to the GEPCO online section for a new GEPCO connection.
  3. Complete the GEPCO application form for a new connection with your data.
  4. Upload the required documents.
  5. Send the application and note the tracking ID.
  6. Use the GEPCO connection system to monitor progress.

This online process reduces physical visits and allows applicants to monitor their applications conveniently.

Offline app in GEPCO offices

For those who prefer manual submission, visit the nearest GEPCO office, collect the form, attach the necessary documents, and send it for processing. Office visits allow applicants to personally address questions and get instructions for the technical aspects of the application.

New GEPCO connection and fees

Understanding fees for a new GEPCO connection

New GEPCO connection fees depend on type and load:

  • Residential connection: Lower fees for installing a basic meter.
  • Commercial and industrial connection: higher load-based fees.
  • A breakdown of new GEPCO connection fees.

The new GEPCO connection fee includes:

  • Application processing fees
  • The cost of installing the meter
  • Service fees (vary depending on position and demand for load)

A table of estimated fees

Connection Type Application Fee Security Deposit Meter Cost Total Estimated Cost
Residential PKR 500 PKR 5,000 PKR 3,500 PKR 9,000
Commercial PKR 1,000 PKR 10,000 PKR 7,000 PKR 18,000
Industrial PKR 2,500 PKR 25,000 PKR 15,000 PKR 42,500

Technical requirements

Before installation, the GEPCO inspection is carried out to ensure the following:

  • Proper wiring and adherence to electrical safety.
  • Failure to connect.
  • Load assessment to determine the correct meter capacity.
  • Applicants should ensure that their premises are ready for inspection to avoid rejection.

The process of approval and installation

How long does it take to get a new connection?

After sending an application for a GEPCO connection, approval usually takes 15-30 days. However, a greater connection may take longer due to technical assessments.

Installation and activation

Once approved:

  • GEPCO engineers attend a place for final inspection.
  • The electricity meter is installed.
  • The connection is activated after verification.

Normal problems and troubleshooting

Why is my new GEPCO connection delayed?

  • Incomplete application forms.
  • Missing or incorrect documents.
  • Non-compliance with electric safety standards.

How to track new GEPCO online connection

Consumers can check the application status using the official website's new GEPCO connection system.

Transfer of GEPCO connection and higher gradation

Transfer of existing connection

If you move to real estate with an existing GEPCO connection, you can transfer ownership by applying together with the documents of assets and CIC.

Upgrade

Do you need more loads? You can apply for upgrades via a new GEPCO connection system and ensure that your premises meet other energy requirements.

The rights and obligations of the consumer

Your rights as a GEPCO consumer

  • Fair processing of new connections.
  • Transparent new GEPCO connection fees.
  • Protection against unjust disconnection of electricity.

Liability for safe use of electricity

  • Prevent an illegal connection.
  • Ensure the correct maintenance of the meter.
  • Report the theft of electricity or manipulation with measuring.

FAQs

What is the period of validity of the new connection application?

The new connection application remains valid for 90 days. If the applicant does not complete the process, he may have to ask again.

Can I apply for a new connection if there is an excellent account on the property?

All previous fees must be cleaned before the new connection is released.

What should I do when my request is rejected?

If your request is rejected, check the reason, fix the problems, and reuse it.

Can we speed up the connection process?

Urgent processing may be available for an additional fee. Contact GEPCO support for more details.

Can I change the connection category after installation?

You can change the connection type by sending the request and the necessary documentation.

What happens when my meter gets damaged?

If the meter is damaged, immediately submit it to GEPCO. A spare fee may be applicable.

Can I ask for more GEPCO connections to the same features?

Yes, but each connection requires separate documentation and justification for further energy demand.

What happens if I give incorrect information in my application?

It's crucial to provide accurate details in your application, as any incorrect information may lead to rejection. Therefore, it's important to double-check your data before submitting your application to avoid any delays or issues.

Are there penalties for unauthorized use of electricity before installing the meter?

Yes, unauthorized use before installing the meter is considered electricity theft and can lead to legal measures.

How can I cancel my new GEPCO app?

If you need to cancel your new GEPCO application for any reason, you can do so by submitting a written request before the meter is installed. This process ensures that you can easily manage your application if your circumstances change.

Does GEPCO offer installment plans for connection fees?

In some cases, installment plans may be available. The customer supports GEPCO support for specific details.

What should I do if my electricity meter doesn't work correctly?

Report the problem to GEPCO customer service. The team will check and replace the faulty meter if necessary.

Conclusion

The application for a new GEPCO connection is now more accessible using online systems and transparent procedures. Use the GEPCO website or call the helpline. Following this manual, you can efficiently go through the GEPCO connection and ensure a smooth installation process.

Frequently Asked Questions

To check your electricity bill online in Pakistan, you can visit the website for your electricity provider and enter your 14-digit reference number. You can find your reference number on any previous bill.

You can check your Sui Gas bill online by visiting the Sui Northern Gas Pipelines Limited (SNGPL) website or the Sui Southern Gas Company (SSGC) website, and entering your 10-digit consumer number.

PakBills - Track and Verify Bills in Pakistan